Interior Designers Cernobbio

Interior Designersin Cernobbio.

Milanese and English, and a few who work in both registers.

Lake Como Province of Como

The trade base here is the deepest on the lake, and it is a function of the city rather than the town: architects, surveyors, structural engineers, restorers and the notarial and legal professions are all in Como, minutes away, and they are used to working on protected buildings. Anyone renovating in Cernobbio has a shorter list of problems than someone renovating at mid-lake for this reason alone.

The complication is regulatory rather than practical. Much of the waterfront is subject to landscape and heritage constraint, several of the villas are individually listed, and works close to the water bring in a further set of consents. None of it is unusual for this lake; all of it takes longer than a first programme assumes, and the right answer is to have the constraints established before you exchange rather than after.

For how this trade works across the whole lake, what to ask for, how the firms are chosen and what goes wrong, read interior designers on Lake Como. For the village itself, read our guide to Cernobbio.

Editorial note: we have not yet written up how this trade works in Cernobbio specifically, so this page is kept out of search until we have. The introduction itself is unaffected. Ask and we will make it.

On the network

7 studios

Held across the lake rather than in one village. We introduce the two we would use ourselves for the job in front of you.

01What they do

A scheme that survives being shut up

Specifying finishes, textiles and metalwork for a house that stands closed and damp for most of the year, and setting out what gets stored each autumn.

Fitting the house that exists

Measuring the stair, the door frames and the landing before anything is ordered, and moving to made-on-site joinery where nothing else will go in.

Working inside the heritage consent

Agreeing with the architect and the authority what can be touched in a protected interior: floors, ceilings, decorative schemes, even service routes.

Delivery and installation

Consolidating shipments, arranging what has to arrive by water, and installing in a window that does not collide with the family's arrival.

Questions

How do interior designers on Lake Como charge?

Usually a design fee by stage or by area, then either a management fee on the fitting-out or a stated margin on goods purchased through the studio. We do not publish rates.

The question worth asking is not how much but how: a studio taking a margin on purchases and a studio taking a flat fee have different incentives when they specify. Either is fine as long as it is stated in writing at the start, and as long as you know which one you have agreed to.

Can I furnish a Lake Como house from abroad?

You can, but check the access first. The stair, the door frames and the landing decide what can physically be delivered, and there is rarely anywhere near the house to hold a container.

Two practical points catch most owners. There is often nowhere to store a shipment while the house is still being worked on, so deliveries have to be timed to the week rather than the month. And anything that will not go up the stairs has to come in through a window, over a terrace or off a boat, all of which need arranging and none of which happen on a wet Tuesday in November.

What ruins interiors in a lakeside villa?

Damp in a closed house, and reflected light off the water. Between them they account for most of what fails in the first few years.

The practical answers are unglamorous: background heat and air movement through the winter, textiles that can be lifted and stored, sun protection on the lake elevation, and finishes on metalwork chosen for a marine-adjacent climate rather than for a city flat. A designer who has not asked how the house is closed each autumn has not begun the job.

Written by The Como Private Desk

For people who work on the lake

Are you the bestat what you do here?

The list we introduce from is short and grows slowly: by working with somebody, seeing how a job goes, and only then adding them. If that is the standard you hold yourself to, tell us who you are. We read every one. We check work before we introduce anybody, and no money passes in either direction.

Put yourself forward